THE Valley Gardens project is heading into its next stage of works.

Work is set to begin on the area at the St Peter’s Place junction, which is between The Level and St Peter’s Church, Brighton.

The taxi rank will be temporarily moved to a new pick up and drop off point opposite the current location.

There will be no right turn access to drivers from Ditchling Road into St Peter’s Place, changes to signalling and temporary crossings for pedestrians and cyclists.

Anyone driving through the area during this time is urged to plan ahead.